The simple version
Most people can name an answer to how long a seller may take, and it is 30 days. The answer is right, and it is also the one least likely to apply to anything you actually bought.
That figure is a fallback. It governs only where the seller stated no time at all, and the moment a seller states one, the stated time is what counts instead.
The other half of it is what the requirement attaches to. It is not a pledge about when the goods will move. It is that the seller had sound reason, at the time it took the order, to expect it could meet the date.
The numbers
- The source is 16 CFR Part 435, Mail, Internet, or Telephone Order Merchandise, read on November 21, 2026 in the 2024 annual edition of the Code of Federal Regulations published by the Government Publishing Office. It is a Federal Trade Commission document.
- Where it sits, and what kind of document it is. The part appears in title 16 under the Federal Trade Commission, beneath a subchapter heading that reads TRADE REGULATION RULES. Its authority line reads 15 U.S.C. 57a and its source line reads 79 FR 55619, Sept. 17, 2014, unless otherwise noted.
- How it frames the requirement. Section 435.2 states that in connection with such sales it constitutes an unfair method of competition, and an unfair or deceptive act or practice for a seller to solicit an order unless, at the time of the solicitation, the seller has a reasonable basis to expect that it will be able to ship any ordered merchandise to the buyer.
- The two timing figures, which sit in the same sentence. Shipment must be expected within that time clearly and conspicuously stated in any such solicitation; or, if no time is clearly and conspicuously stated, within thirty (30) days after receipt of a properly completed order from the buyer. Where the buyer applies to the seller for credit to pay in whole or in part, the section gives the seller fifty (50) days.
- What shipment means here, which is not what most people picture. Section 435.1 states that shipment shall mean the act by which the merchandise is physically placed in the possession of the carrier.
- When the clock starts. Both figures run from receipt of a properly completed order, which section 435.1 ties to the seller having both the buyer's payment in the proper amount and an order carrying the information needed to process and ship it, with separate handling where a payment is dishonored or credit is refused.
- What has to happen if the date slips. Section 435.2 requires the seller to offer the buyer a choice between consenting to a delay and having the order treated as ended with a prompt refund, and it requires a reasonable basis for any revised date the seller gives.
- How fast the money has to come back. Section 435.1 defines a prompt refund for the main case as one sent by any means at least as fast and reliable as first class mail within seven (7) working days of the date on which the buyer's right to refund vests, with one billing cycle used for certain credit refunds.
- What the part does not reach. Section 435.3, headed Limited applicability, states the part does not apply to subscriptions such as magazine sales ordered for serial delivery after the initial shipment is made in compliance with the part, to orders of seeds and growing plants, to orders made on a collect-on-delivery basis, or to transactions governed by the prenotification negative option plans rule at 16 CFR Part 425.
- A limitation worth stating. Apart from the eCFR page used only to check how current the text is, this article rests on one document, and a second source would show how the rule has actually been applied, which nothing here does.
- Why seven working days is longer than seven days, which is ours rather than the document's. A count of seven working days covers 9 calendar days where one weekend falls inside it and 11 where two do, and a public holiday inside that stretch pushes it further out. The part as read does not define the term, so this is a calendar observation and not a reading of the rule.
- How current the text is. The eCFR page for this part, read the same day, showed title 16 current as of November 19, 2026 and last amended November 18, 2026, and showed no change to this part after January 3, 2017.
- For a different clock people often assume covers any purchase, see our piece on whether you have three days to cancel. For a Federal Trade Commission document that is a guide rather than a rule, and is worded accordingly, see our piece on bait advertising.
Why the stated date is the one that counts
A default exists for the case nobody settled in advance. If a seller takes an order and says nothing about timing, the text sets a figure so the question has an answer at all.
Sellers almost never say nothing. An estimate on a checkout page is a stated time, and once it is stated the fallback steps back and the stated one governs.
That is the opposite of how the figure gets quoted. It is not extra time every seller enjoys on top of its own estimate. It is what fills the gap where nothing was said.
What follows from that is about evidence more than entitlement. What the seller told you at checkout is the figure it gets measured against, so the page you saw matters more later than the fallback everybody repeats.
The actual math on the two windows
Start with the gap between the two figures in that one sentence. The fallback is 30 days, and where the buyer asks the seller for credit to pay, it is 50, which is 20 days longer.
As a ratio that is 50 against 30, or about 1.67, so the credit case runs roughly two thirds longer than the plain one.
Both are counted from when a properly completed order reaches the seller, not from when the buyer clicked. That start point can sit days after the purchase if anything the seller needed was missing.
The 20 day gap, the 1.67 ratio and the two thirds are ours. The 30 and the 50 are the document's own.
What this means
When an order runs late, the first thing to find is what the seller told you at the moment you bought, because that is the figure it is measured against. A screenshot of the checkout page is worth more later than the fallback everybody quotes.
The second habit is to read the unit on any deadline before trusting it. A count quoted in working days runs longer than the same number of plain days, and longer again in a week that carries a public holiday.
This article reports what one Federal Trade Commission document says. It is general education and not legal advice, it does not assess whether any seller complies with anything, and it is not a claim about any company.
What this is NOT
This article reports the text of 16 CFR Part 435, the Federal Trade Commission's Mail, Internet, or Telephone Order Merchandise rule, as read on November 21, 2026 in the 2024 annual edition of the Code of Federal Regulations, with the online sale week that follows Thanksgiving as the occasion for reading it. It is not legal advice, and nothing here should be relied on as a statement of anyone's rights or obligations: a reader with a late or undelivered order should take it to the seller, to their card issuer, to the agency or to a lawyer, not to this page. It is not a claim that any retailer or seller has met or failed to meet any requirement, and no seller's terms, checkout page or delivery estimate was examined for this piece. It is not a complete account of the part, which is quoted in places and summarized in others, and several of its provisions, including its record-keeping provisions and the detail of when consent to a delay is treated as given, are mentioned only in outline or not at all. It is not an account of any state's law, none of which was read, and the part itself addresses the position of state and local rules in terms we do not set out here. It is not advice about shopping, spending, borrowing, disputing a charge or any purchase, and it recommends nothing. The arithmetic on working days is a calendar observation and not a legal reading: the part as read does not define working days, so the 9 and 11 day counts describe only how seven working days can fall on an ordinary calendar. We read the part in a single annual edition rather than in the live text, though the eCFR page for the part, opened the same day, showed title 16 current as of November 19, 2026 and no change to this part after January 3, 2017. Ours are the 20 day gap, the 1.67 ratio, the two thirds and the 9 and 11 calendar day counts; the 30 days, the 50 days, the seven working days, the one billing cycle and every quoted phrase, section number, date and authority citation are the code's own. This is not a political endorsement or criticism of anyone.
Sources
- U.S. Government Publishing Office, Code of Federal Regulations, 2024 annual edition, title 16 volume 1, Part 435, Mail, Internet, or Telephone Order Merchandise, at govinfo.gov/content/pkg/CFR-2024-title16-vol1/xml/CFR-2024-title16-vol1-part435.xml, read November 21, 2026, for the subchapter and part headings, the authority and source lines, the framing sentence and both timing figures in section 435.2, the definitions of shipment, receipt of a properly completed order and prompt refund in section 435.1, the delay and refund machinery, and the Limited applicability provisions of section 435.3. Read as XML in a browser on the publisher's own domain.
- Office of the Federal Register, eCFR, title 16 chapter I subchapter D, Part 435, at ecfr.gov/current/title-16/chapter-I/subchapter-D/part-435, read November 21, 2026, for the statement that title 16 is current as of November 19, 2026 and last amended November 18, 2026, and for the absence of any change to this part after January 3, 2017.
Receipts1 receipt: the source's own words, with a link to eachShowHide
If no time is clearly and conspicuously stated, within thirty (30) days after receipt of a properly completed order from the buyer
16 CFR 435.2, Mail, Internet, or Telephone Order Merchandise, 2024 annual editionRead Nov 21, 2026Open the source (opens in a new tab)